Showing posts with label media release. Show all posts
Showing posts with label media release. Show all posts

Wednesday, 7 September 2016

Media Release: Small School Model

Vancouver, B.C. – Imagine the ideal school — one where every child knows and looks out for each other, teachers offer unique learning opportunities, children play and learn in expansive outdoor green spaces, convenient out-of-school care is provided at an adjacent community centre, and parents are actively involved in the life of the school. Now, imagine closing that school. The ideal school described above is Dr. A.R. Lord Elementary School — the epitome of a flourishing small school — yet it is on the Vancouver School Board’s list for potential closure. 
“The very fact that A.R. Lord is small provides invaluable benefits to our children and their learning,” says parent Lisa Patterson. “There’s a sense of connectedness and community that just can’t be replicated in a large school.”
Numerous studies in both Canada and the United States indicate small schools provide demonstrable benefits in the form of educational success, positive social and interpersonal behaviour, increased extracurricular participation and community engagement. The benefits are particularly pronounced for children who experience learning or health challenges.
Anita Coueffin’s grandson, Ryan, attends A.R. Lord. He has autism and is excelling in the small school setting. “It has been a very long, arduous process to get Ryan comfortable and feeling good about coming to school,” says Coueffin. “When Ryan is stressed out, his autistic tics become very overwhelming to him and also to his classmates. Because our school is small, Ryan feels very safe and he knows that everyone in the school understands his autism. If Ryan were moved to a large school it would be absolutely detrimental to his well-being.”
One of the reasons Sarah MacKinnon chose to send her child, Eila, to A.R. Lord is because she has life-threatening tree nut allergies. “I know that everyone in the school is aware of Eila’s food allergies and are on the lookout to keep her safe. I would not have the same sense of security in a larger school,” says MacKinnon. Her son also has food allergies and is due to start kindergarten at A.R. Lord in 2017.
Many other children at A.R. Lord who have anxiety, or other conditions or challenges are able to attend school regularly and thrive because, as research has proven, in small schools the relationships between students, parents and teachers are strong, trusting and ongoing. This enhances learning, increases parental involvement (a critical factor in student success) and improves satisfaction for all.
“If schools are closed based on a formula of cost-per-student, smaller schools will have trouble competing with larger schools,” says Patterson. “The formula needs to value learning outcomes, social cohesion and healthy communities. If it does, smaller schools like A.R. Lord will come out on top.”
Even the Vancouver School Board’s website indicates the optimum size for an elementary school is between 200 and 400 students. At current growth rates in the student population, A.R. Lord will be at its full capacity of 200 students in less than three years.

Wednesday, 17 August 2016

Media Release: Seismic Upgrades A Moral Imperative Before Merging Schools

Vancouver, BC - Parents of Dr. A.R. Lord Elementary School students are distraught over a plan to move their children to a school with the highest possible rating for collapse and loss of life in an earthquake. 

A.R. Lord is one of 12 schools targeted for possible closure by the Vancouver School Board in its attempt to secure funding for seismic upgrades. The VSB’s preliminary plan suggests moving A.R. Lord students to Sir Matthew Begbie to help meet the Ministry of Education’s requirement that Vancouver have a district-wide capacity utilization of 95 per cent to qualify for seismic funding. 
Begbie is classified as High 1 (H1), the most vulnerable structure with the highest risk of widespread damage or structural failure. A.R. Lord is a High 3 (H3), which is at risk for isolated failure to building elements such as walls.
“No child should have to go to school in an unsafe building. But to take an already unsafe school and pack it to capacity is unconscionable,” says concerned parent Lisa Patterson. “The Province’s requirement is, in effect, creating death traps for our children.” 
A.R. Lord parents are concerned not only for the lives of their own children but also of those children who already attend Begbie. Parents demand the VSB and Education Minister Mike Bernier answer the following questions:
  • What is the percentage increase in risk of loss of life in an H1 building vs. an H3 building at various magnitude earthquakes?
  • How does adding the weight of an additional 150 to 200 students to a three-storey H1 building affect structural damage in the event of an earthquake?
  • How does having a three-storey H1 building at full capacity affect the escape and/or survival rate of children and teachers?
  • What precedent is there for requiring a school district to be at 95-per-cent capacity in order to receive funding for seismic upgrades?
  • In the event of an earthquake, who would be liable for the increased loss of life resulting from the merger of schools into a high-risk building – the VSB, the Province or both?
At minimum, A.R. Lord parents demand that Begbie receive seismic upgrades prior to moving their children to the school. Considering current growth rates in the student population, it is likely that A.R. Lord itself will be at 95-per-cent capacity in less than three years.
For full Media Release and Interview Contact Info: https://www.savearlord.com/province-creating-death-traps-for-school-children/

Thursday, 14 July 2016

NEWS RELEASE: FLAWED METHODOLOGY FOR CAPACITY CALCULATION

NEWS RELEASE July 14, 2016
Province’s skewed methodology for calculating capacity utilization makes schools appear empty
Students caught in budget battle between Province and school boards 
Vancouver, B.C. – Parents of Dr. A.R. Lord Elementary School students are outraged by the budget battle between the Province and the Vancouver School Board, which threatens to close their vibrant neighbourhood school.
A.R. Lord is one of 11 East Vancouver schools targeted for possible closure based on the Province’s unrealistic target of 95-per-cent capacity utilization to receive funding for seismic upgrades and their mandated methodology to calculate that capacity utilization. The methodology, which is seriously flawed, makes schools appear empty when they are not.

Link to full news release and fact sheet: 
http://www.savearlord.com/provinces-skewed-methodology-for-calculating-capacity-utilization-makes-schools-appear-empty/